Al Darwish Engineering
هندسة الدرويش (ذ.م.م)
loading...
التحميل...
Project

New Doha International Airport – CP -094

Steel Structure buildings of total built up area 50,000 sqm comprising the following: 4 Buildings with two levels of mezzanine areas containing workshops, storage area, offices and staff facilities. A security gate house and internal/external security checkpoints and an electrical equipment room are also provided.

Employer

New Doha International Airport Steering Committee

Consultant

Bechtel

Duration

2012