The North Road stretch in this package starts just after the landing of the immigration interchange crosses Al Markhiya-Al Hanaa (2-lane dual) arterial road at the Land-Mark location via a grade separated interchange and continues till it ends after Al-Gharrafa interchange.
Dual carriageway bridge (Land-Mark Interchange) comprises the construction of approximately 10 km of Road Works, Bridge Works, Pedestrian overpass, pumping stations and retention reservoirs, Water mains 100 mm to 1200 mm Ø (D.I. Pipes) total length – 9275 lm.